Add to Cart
HBT80SR21186C Concrete Pump Machine
Hydraulic Diesel Concrete Pump 1400mm Feeding Height Long Service Life
Name of parameter | Unit | HBT80SR21186C |
Output capacity | m3/h | 53(high pres.)/86(low pres.) |
Output pressure | MPa | 21(high pres.)/13(low pres.) |
Distribution Valve | S Valve | |
Diesel engine | BF6M1013-25T3R/1 (DEUTZ-DALIAN) | |
Rated power of diesel engine | kW | 186 |
Rated rotating speed of diesel engine | rpm | 2100 |
Displacement of the main oil pump | ml/r | 260 |
Oil pres.of the pumping system | MPa | 32 |
Delivery cylinder diam.×stroke | mm | Φ200×1800 |
Hydraulic system circle form | Twin-pump and -circuit open sys. | |
Hopper volume | L | 730 |
Feeding height | mm | 1400 |
Oil tank volume | L | 500 |
Max.grain size | mm | pebbleФ50,crush.stoneФ40 |
Overall dimension L×W×H | mm | 6460×1962×2620 |
Total mass | kg | 6900 |
Materials and specifications are subject to change without notice.
Deutz(made in CHINA)diesel engine possesses blowing cooling to greatly reduce the temperature of the hydraulic system.
Electric control system
(1) Control boxcenclosed.Touch screen:allkinds of operating parameters can be stored and displayed.
(2) Double controller auto-pumping technology.
Hydraulic system
(1) Circuit:twin-pump,twin-circuit open system.
(2) Controllable air coolingfull flow forced air-cooling radiator,ensure the hydraulic system works under the best temperature condition(60℃).
(3) Oil pumps&main valves:from REXROTH:manual reliefvalve is made in Italian GALTECH.Automatic lubrication adopts multi-point centralized phase sequence follow-up design, which is precise, concise, fuel-efficient and reliable.
Maintenance of concrete pump
General requirements
● The operator must act in accordance with the operating instruction.
● Always stop the engine and shut off main power supply before maintenance.
14-fig.(1)Maintenance of concrete pump
In ZOOMWOLF concrete pump user's manual, the maintenance requirements of concrete pump at different stages of service period are specified.
1. Daily maintenance
2. Maintenance after 50 hours operation.(1500-2500m3)
3. Maintenance after 100 hours operation.(3500-5000m3)
4. Maintenance after 500 hours operation.(15000-25000m3)
5. Maintenance after 750 hours operation.